Investment procedures.
Full support for IRC & ERC documentation.

industrial cluster
Industrial cluster

Ez.Park Ha Tinh is a well-planned industrial cluster in Duc Tho, with ready infrastructure and connections, and a prepared land bank for manufacturing, processing and supporting industries to invest efficiently and sustainably.
Read more...Ez.Park Ha Tinh I sits at the heart of the North Central connection, with convenient access to road, rail, waterway and air routes, offering strong advantages for production and logistics.
Read more...The Ez.Park Ha Tinh I industrial cluster has synchronized infrastructure, existing operating factories and a reasonably planned land bank, creating a long-term, sustainable platform for businesses.
Read more...CITincentives
for first 2 years
for next 4 years
Import-exporttax incentives
FULLSUPPORT
Legalproceduresfrom the investor
Dedicated support from investor GS HOLDING
Full support for IRC & ERC documentation.
Construction, fire safety, labor permits and related procedures.
Handover, infrastructure connection, ready for equipment installation and production.
Ready-built factory for lease or build to suit, contractor support.
Dedicated support from investor GS HOLDING
Full support for IRC & ERC documentation.
Construction, fire safety, labor permits and related procedures.
Handover, infrastructure connection, ready for equipment installation and production.
Ready-built factory for lease or build to suit, contractor support.

Sign MoU / Pay deposit
Complete IRC, ERC and project report procedures
Sign land sublease and infrastructure agreement
Receive handover and sign land handover dossier
Receive land use right certificate (red book)
Complete EIA approval
Detail plan approval + fire safety approval
Base design approval
Construction drawing approval / Construction permit
Sign MoU / Pay deposit
Complete IRC, ERC and project report procedures
Sign land sublease and infrastructure agreement
Receive handover and sign land handover dossier
Receive land use right certificate (red book)
Complete EIA approval
Detail plan approval + fire safety approval
Base design approval
Construction drawing approval / Construction permit
FDI
Area
Labor